About the framework
Developed by Pretium in partnership with Contracting Authority Watford Community Housing, the PCR 2015-compliant framework gives a single point of access to works and services for every part of the development process, from design, site preparation and demolition works at the front end to the construction work itself and a wide range of consultancy services.
It is suitable for the construction of both homes and non-dwelling units including, shops, offices and light industrial and industrial units, as well as commercial, community and educational buildings.
Intended to ensure best practice, innovation and customer service are at the heart of development activity the multi-disciplinary solution is capable of meeting changing needs and will support with the project management of development works large and small, as well as giving access to a directory of professional services.
Using consultants from the framework gives Authorised Users assurance that they are getting robust management of the build process and delivery, with a single point of access to services for every part of the process.
Framework users can choose between mini-competition and direct selection to suit operational requirements and project circumstances and a member of the Pretium team will advise and support you through the call-off procurement process.
The Lots
The Lot structure, which is as follows, has been designed to give SMEs an equal opportunity and there is an intentional overlap between the values of Lots 1 and 2.
Lot 5 – Employer’s Agent and Cost Consultant
Lot 8 – Structural and Civil Engineering Consultants
Lot 9 – Development Manager
Lot 10 – Demolition, Removal and Site Preparation
Lot 11 – M&E Consultants
Lot 12 – Fire Consultants
Lot 13 – Environmental Consultants